Monday, September 22, 2025

CityView Plaza Evolves: Demolition Paves Way for Downtown San Jose's Next Chapter

Demolition work at CityView Plaza has officially begun, where crews have cleared a nearly two-acre site at 185 Park Avenue for an eight-story parking garage and retail hub known as The Shops at CityView. This phase transforms a former commercial campus at Park Avenue and Almaden Boulevard, replacing outdated structures like a bank branch, parking garage, and office building with modern amenities. The new garage will provide 1,135 spaces to support nearby offices and future residents, while 35,000 square feet of ground-floor shops add vitality to the street level.

Architectural highlights include a perforated metal facade with vertical fins for visual interest, and floor-to-ceiling windows for the retail spaces overlooking landscaped sidewalks. Nearby, renovations at 150 South Almaden Boulevard upgrade a 15-story office tower with a refreshed lobby, conference center, and fitness facilities spanning 204,000 square feet. Adaptive reuse efforts convert existing buildings into housing, such as 145 units at 100 West San Fernando Street, 22 at 130 South Almaden Boulevard, and 163 at 125 South Market Street, blending preservation with contemporary living.

Phase two brings even more ambition with The Tower at CityView, a 27-story high-rise at 121 South Market Street set to offer 360 apartments from studios to three-bedroom penthouses, rising 293 feet. Renderings show pedestrian-friendly designs, internal pathways, and green spaces that connect the campus. Led by Jay Paul Company with designs from DES Architects + Engineers and Solomon Cordwell Buenz, the project emphasizes connectivity near light rail and future BART stations.

With the site now fully leveled after starting demolition in April, construction on The Shops could wrap in about 24 months following recent plan amendments.


Source: SF YIMBY

No comments:

Post a Comment