Friday, January 30, 2026

East San Jose's Light Rail Extension Advances Toward 2028 Opening

San Jose marks a significant step forward in public transit with the ongoing construction of the VTA Orange Line extension, a 2.4-mile addition that connects East San Jose more directly to the broader Bay Area network. This project, the first light rail expansion in over two decades, stretches from Alum Rock Station along Capitol Expressway to a new terminus at Eastridge Transit Center. Elevated viaducts carry the line above busy roadways, minimizing disruptions and enhancing safety for riders and drivers alike.

The extension includes two new stations designed for convenience and accessibility. An elevated stop at Story Road features pedestrian bridges, elevators, and stairs to link seamlessly with surrounding neighborhoods. The at-grade station at Tully Road integrates with the Eastridge Mall and existing bus services, making transfers straightforward. This setup supports local businesses during construction and promises to boost foot traffic once operational, invigorating commercial areas like shopping centers and eateries along the route.

Beyond immediate connectivity, the line links to BART at Milpitas, opening up efficient travel options to destinations across the region. Residents in East San Jose gain reliable alternatives to car travel amid growing congestion on major arterials. The development also highlights opportunities for smarter land use, such as reimagining underutilized spaces like Reid-Hillview Airport for community benefits.

The total budget exceeds $650 million and the grand opening is anticipated for 2028 (a year earlier than planned).

For more details, watch the video: https://www.youtube.com/watch?v=xiHmXvXd6KU

Source: Usedmedia on Skyscraper City

No comments:

Post a Comment