Sources familiar with the deal report that Nvidia has secured a lease on the 302,800-square-foot industrial building at 5853 Rue Ferrari in the Santa Teresa district. City filings from earlier this year outline plans for research and laboratory spaces, work labs, an office area complete with a conference room, and at least one computer lab equipped with server racks. The facility is designed to draw 49 megawatts of power, with earlier proposals also exploring on-site electricity generation.
Prologis, which took ownership of the 17-acre site through its acquisition of Duke Realty, has already begun tenant improvements. The building shell stands complete, and recent on-site observations show active construction both inside the structure and on adjacent grounds. CBRE continues to handle marketing for the property, which offers high clear heights, substantial dock capacity, and power infrastructure expandable well beyond the initial tenant requirements.
This move aligns with Nvidia’s pattern of assembling additional land near its Santa Clara headquarters to support ongoing growth. The Santa Teresa location sits roughly a mile from PG&E’s recently upgraded substation on Santa Teresa Boulevard, where capacity has already doubled to 80 megawatts with further expansion planned over the next three years. That infrastructure work, originally driven by data center demand, now positions the broader area to accommodate the power needs of advanced technology operations.
Such investments underscore the continued pull of South San Jose for companies that require both space and reliable energy to push computing and artificial intelligence capabilities forward. The combination of available industrial stock, highway access, and expanding utility capacity keeps the southern edge of the city firmly in the conversation as Silicon Valley’s physical footprint evolves.
Source: The Mercury News

No comments:
Post a Comment